030 DO Zoro WS (070) (-2.00) (250) ED2 1200) 4300) -1.60 2.50 2.50 2.60 150 0x70 2.50 QCXOE 30 x 70 30x70 2.60 Determi

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

030 DO Zoro WS (070) (-2.00) (250) ED2 1200) 4300) -1.60 2.50 2.50 2.60 150 0x70 2.50 QCXOE 30 x 70 30x70 2.60 Determi

Post by answerhappygod »

030 Do Zoro Ws 070 2 00 250 Ed2 1200 4300 1 60 2 50 2 50 2 60 150 0x70 2 50 Qcxoe 30 X 70 30x70 2 60 Determi 1
030 Do Zoro Ws 070 2 00 250 Ed2 1200 4300 1 60 2 50 2 50 2 60 150 0x70 2 50 Qcxoe 30 X 70 30x70 2 60 Determi 1 (151.96 KiB) Viewed 18 times
030 Do Zoro Ws 070 2 00 250 Ed2 1200 4300 1 60 2 50 2 50 2 60 150 0x70 2 50 Qcxoe 30 X 70 30x70 2 60 Determi 2
030 Do Zoro Ws 070 2 00 250 Ed2 1200 4300 1 60 2 50 2 50 2 60 150 0x70 2 50 Qcxoe 30 X 70 30x70 2 60 Determi 2 (114.82 KiB) Viewed 18 times
030 DO Zoro WS (070) (-2.00) (250) ED2 1200) 4300) -1.60 2.50 2.50 2.60 150 0x70 2.50 QCXOE 30 x 70 30x70 2.60
Determine the quantities of the following 1. Excavation 2. Backfilling 3. Plain Concrete Footing Determine also the total project cost with the following considerations: Contingency - 5% Overhead - 5% Engineering Professional Fees - 10% Labor - 5 workers (500 per day) and 1 foreman (700 per day) Schedule: Excavation (2 weeks) Formwork and Rebar (1 week) Concrete Pouring (3 days) Backfilling (2 days) • Unit Prices: Excavation (2000 per cu. m.), Backfilling (2000 per cu.m.) Plain Concrete Footing (5000 per cu. m.) -