@ RL B/S (m) I/S (m) F/S (m) HI (m) (MAMSL) 0.666 124.122 123.456 0.570 123.552 0.634 123.488 Remarks BM SIOS 0-000 0-02

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

@ RL B/S (m) I/S (m) F/S (m) HI (m) (MAMSL) 0.666 124.122 123.456 0.570 123.552 0.634 123.488 Remarks BM SIOS 0-000 0-02

Post by answerhappygod »

Rl B S M I S M F S M Hi M Mamsl 0 666 124 122 123 456 0 570 123 552 0 634 123 488 Remarks Bm Sios 0 000 0 02 1
Rl B S M I S M F S M Hi M Mamsl 0 666 124 122 123 456 0 570 123 552 0 634 123 488 Remarks Bm Sios 0 000 0 02 1 (35.57 KiB) Viewed 25 times
Rl B S M I S M F S M Hi M Mamsl 0 666 124 122 123 456 0 570 123 552 0 634 123 488 Remarks Bm Sios 0 000 0 02 2
Rl B S M I S M F S M Hi M Mamsl 0 666 124 122 123 456 0 570 123 552 0 634 123 488 Remarks Bm Sios 0 000 0 02 2 (34.32 KiB) Viewed 25 times
@ RL B/S (m) I/S (m) F/S (m) HI (m) (MAMSL) 0.666 124.122 123.456 0.570 123.552 0.634 123.488 Remarks BM SIOS 0-000 0-025 0-050 0-075 0.681 123.44-1 0.710 123.412 0.690 123.432 0+100 0.033 1.705 122.45 122.417 2.891 119.599 4.596 TP 2 BM S102 M W 0.699 6 checks EBS- EFS = Last RL- First RL -> 0-699-4.596 = 119.539 - 123.456 - 3.897 - 3.897 Slope = RL₂5-RL, 75-25 xlow XIR 123.438-123.412 50 = 0.152 % Ane
Question 2 On a graph paper OR drafting software (for example AutoCAD) use appropriate horizontal and vertical scales to produce a longitudinal section of the centre line of the existing road from chainage 0+000 to chainage 0+100 in question 1 above. Plan should have appropriate map components (horizontal and vertical scales, orientation, title) [10 marks Question 3 Using the plan prepared in question 2, design a new road with a horizontal formation level from 0+000 to 0+100 that is 124.000mAMSL. For each cross-section the existing ground slopes upward from left to right, at a gradient of 1:8, the formation-width being 20m and the side slopes 1:1.5. 1) Show on the plan (in red ink) the formation level of the road. [2 marks] ii) Using the plan determine the depth of cut or fill at each chainage in ground units 15 marks iii) Calculate the area for each section. [15 marks iv) Calculate the volume of excavation from 0+000 to 0+100. [3 marks]