13 6 8 15 E8 4 Question 3 A power plant is to be built close to a river. To protect the construction site, a temporary c

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

13 6 8 15 E8 4 Question 3 A power plant is to be built close to a river. To protect the construction site, a temporary c

Post by answerhappygod »

13 6 8 15 E8 4 Question 3 A Power Plant Is To Be Built Close To A River To Protect The Construction Site A Temporary C 1
13 6 8 15 E8 4 Question 3 A Power Plant Is To Be Built Close To A River To Protect The Construction Site A Temporary C 1 (67.73 KiB) Viewed 44 times
please help me answer this question
13 6 8 15 E8 4 Question 3 A power plant is to be built close to a river. To protect the construction site, a temporary cofferdam is being built. The annual maximum flood over a 9-year period produced the following river stages at the site of the plant Year Stage (m) 5 2 3.8 3 2.6 6 404 55 8 3 9 a If the cofferdam is to be built to withstand a stage of 5.5m, whal is the risk of being flooded during the 4-year construction period? b) What is the probability of not being flooded during the construction period?