Facilities is planning to run a 0.25m diameter, 10m long steam pipe under the ground floor of the Engineering Center. Fr

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Facilities is planning to run a 0.25m diameter, 10m long steam pipe under the ground floor of the Engineering Center. Fr

Post by answerhappygod »

Facilities Is Planning To Run A 0 25m Diameter 10m Long Steam Pipe Under The Ground Floor Of The Engineering Center Fr 1
Facilities Is Planning To Run A 0 25m Diameter 10m Long Steam Pipe Under The Ground Floor Of The Engineering Center Fr 1 (75.04 KiB) Viewed 34 times
Facilities is planning to run a 0.25m diameter, 10m long steam pipe under the ground floor of the Engineering Center. From the blueprints, they have determined that the pipe will be located 1m under the floor which is made of cement that has a thermal conductivity of 1.4 W/m/K. The steam pipe will have a heat rate of 2.5kW and a surface temperature of 99 °C. What will the temperature the floor? Will Facilities have to worry about the temperature impacting anyone walking on the floor? Ground Floor 1m 10m Floor TSurface: 99 °C Ø: 0.25m
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply