Question #1 (5 points) Management wants to design an assembly line that will turn out 800 videotapes per day. There will

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question #1 (5 points) Management wants to design an assembly line that will turn out 800 videotapes per day. There will

Post by answerhappygod »

Question 1 5 Points Management Wants To Design An Assembly Line That Will Turn Out 800 Videotapes Per Day There Will 1
Question 1 5 Points Management Wants To Design An Assembly Line That Will Turn Out 800 Videotapes Per Day There Will 1 (45.66 KiB) Viewed 43 times
Question #1 (5 points) Management wants to design an assembly line that will turn out 800 videotapes per day. There will be eight working hours in each day. The industrial engineering staff has assembled the information below: Task Time (min.) Immediate Follower a b С d e f g h i .2 .2 .4 .1 .3 .2 .1 2 .6 b,d f b,e e f h h i none A) Determine the optimum cycle time (i.e., actual operating time/desired output). B) What is the minimum number of stations needed? c) Assign tasks to work stations. D) What is the efficiency of this assembly line?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply