22. Max's Munchies frosted cookie production line is monitored for frosting coating, sprinkles, color, pat- and other vi
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
22. Max's Munchies frosted cookie production line is monitored for frosting coating, sprinkles, color, pat- and other vi
Quality Control Charts for Attributes the problem. Production quality levels have been rela- tively high recently and Max is contemplating eliminat- ing the second line. Eight cookies are sampled every 15 minutes. If these cookies don't pass inspection, the next 15 minutes' worth of production are run through the secondary line. Create the control limits and centerline for this chart. Graph and interpret this chart. Should Max keep the secondary line for the time being? Subgroup Number OOP 1 4 6 7 9 10 11 12 13 14 15 16 17 18 19 20 с n = 8 1 0 1 0 1 0 1 0 2 0 1 0 0 0 1 0 0 10 359