NEW PLACE FOUNDATION, PROJECT MH. BEYOND ALL FIREBOK FOODWINT WITH M BOTTON 3 WAY, SUBGRADE - SEE NOTE 17. NEW MASONRY F

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

NEW PLACE FOUNDATION, PROJECT MH. BEYOND ALL FIREBOK FOODWINT WITH M BOTTON 3 WAY, SUBGRADE - SEE NOTE 17. NEW MASONRY F

Post by answerhappygod »

New Place Foundation Project Mh Beyond All Firebok Foodwint With M Botton 3 Way Subgrade See Note 17 New Masonry F 1
New Place Foundation Project Mh Beyond All Firebok Foodwint With M Botton 3 Way Subgrade See Note 17 New Masonry F 1 (154.21 KiB) Viewed 24 times
1. Calculate the total area of the concrete footing.
2. Determine the amount of rebar needed for the foundation wallsshown in the Figures. Allow for 2 inches of cover. Add 10 percentfor lap and waste to the continuous bars.
3. Determine the cost to install the rebar for the foundationwalls using a productivity of 10.75 labor hours per ton and anaverage labor rate of $25.62 per labor hour.
4. Determine the cost to form the foundation walls in Figuresusing the productivity of 0.125 labor hours per SFCA and an averagelabor rate of $25.62 per labor hour.
5. Using a waste factor of 5 percent, determine the number ofcubic yards of concrete needed to pour the foundation walls shownin the Figures and Assume the wall is 8 inches thick.
NEW PLACE FOUNDATION, PROJECT MH. BEYOND ALL FIREBOK FOODWINT WITH M BOTTON 3 WAY, SUBGRADE - SEE NOTE 17. NEW MASONRY FOUNDATION PROJECT MIN. 6 BEYOND ALL COSPRINT WITH M AT 12 OC. EACH WAY, BOTTOM 3 SUBGRADE SEE NOTE 17. CLR OF FOUNDATION/FLOOR FRAMING PLAN UNDER BEARING WALL (2) LOCATIONS HO SRL P SEE DETAR ( COLUMN, BEAR ON PLATE -6X1-8 X 10" DEEP FOOTING X 10 DEEP FOOTING for the FLOOR A INSTALL SMPSON 'ABMG POST BASE AT THESE (2) LOCATIONS- EXISTING FOOTING AND STEM WALL BELOW -NEW OUR BLOOR A INSTALL SIMPSON ABUEG POST BASE AT THESE (2) LOCATIONS- TO UNDERSIDE O COLUMN, BEAR ON PLATE TIS HOLDOG REMOVED ON TYPICAL SEE ARCH FOR LOCATIONS SEE DETAIL (3 HTYP Estat NEW FOOTING AND STEM WALL CONT, FOOTING, SEE ORIGINAL PLANS T STUDS SPACED AT 16 OC CUT NEW CRAWL SPACE ACCESS NEW MASONRY CHIMNEY/FIREPLACE FOUNDATION, PROJECT MIN. 6 BEYOND ALL SIDES OF FIREBOK FOOTPRINT WITH MY AT 12" OC. EACH WAY. SUBORADE SEE NOTE 17. 4X4 POST (3) LOCATIONS COLUMN BEAR ON PLATE AND FOOTING BELOW -FOUNDATION VENTS PER A MIN. OF 2-0 AWAY FROM FOUNDATION WINDOWS. FOUNDATION/FLOOR FRAMING NOTES: -PROVIDE NEW 2 x 8 P.T. LEDGER CIA EMBED NEW FOOTTO DISTING FOUNDATIONS WITH & MN. EMBEDMENT IN SIMPSON SET EPOKY TYPICAL MATCH DESTING ALL CONT. FOOTING, SEE ORIGINAL PLANS. EMBED AT 16" 0.c. HO▬▬B▬
NEW MASONRY- CHIMNEY/REPLACE FOUNDATION, PROJECT MIN. 6 BEYOND ALL SIDES OF FIREBOK FOOTPRINT WITH AT 12 OC. EACH WAY, BOTTOM 3 CUR OF SUBGRADE - SEE NOTE 17. 6€ NEW MASONRY CHIMNEY/FIREPLACE FOUNDATION, PROJECT MN. 6 BEYOND ALL SIDES OF FIREBOK FOOTPRINT WITH # AT 12 OC. EACH WAY, BOTTOM 3 CUR OF SURGRADE - SEE NOTE 17. SUBGRADE 153.0 ABOVE -NEW DOUBLE 2 X 12 UNDER BEARING WALL -NEW 4 X 4 POST (2) LOCATIONS ZA X71/4" NO 8 DETAL ( ABOVE NEW 1'-6" X 1-6- X 10" DEEP FOOTING AT NEW 4X4 POST NEW 1'-6" X 1-6 x 10" DEEP FOOTING AT NEW 4X4 POST- NEW 6 X WOOD COLUMN PROJECT THROUGH FLOOR AND INSTALL SIMPSON 'ABU' POST BASE AT THESE (2) LOCATIONS- NEW XWOOD- COLUMN, BEAR ON PLATEX 12 EXISTING FOOTING AND STEM WALL BELOW NEW 6X6 WOOD COLUMN PROJECT THROUGH FLOOR AND INSTALL SIMPSON 'ABU' POST BASE AT THESE (2) === 343 LOCATIONS- LOCATIONS- TE S HE 4X 12- OUT NEW CRAW SPACE ACCESS 2-0 2X STUD INFILL AT- REMOVED WINDOWS TYPICAL SEE ARCH. FOR LOCATIONS. SILL PLATE-SEE S 2-0 MIN 22) SIMPSON HAPP. 38 NEW FOOTING AND STEM WALL MATCH EXISTING 1-6" x 10" DEEP CONT, FOOTING, SEE ORIGINAL PLANS. NEW 2 X 6 STUD WALL WITH cata STUDS SPACED AT 16" O.C. PLOCHA CUT NEW CRAW SPACE ACCESS 2-0 2-0 MH., -4 X 4 POST (3) LOCATIONS SMPSON WITH -NEW MASONRY CHINNEY/FIREPLACE FOUNDATION, PROJECT MIN. 6 BEYOND ALL SIDES OF FIREBOK FOOTPRINT WITH AT 12" 0.C. EACH WAY, BOTTOM 3 CUR OF SUBGRADE SEE NOTE 17. PHOLDSOP NEW 2 X 8 FLOOR JOISTS AT 16 Oc OC -NEW 6 X WOOD COLUMN, BEAR ON PLATE -EXISTING STEM WALL AND FOOTING BELOW SIMPSON CUT NEW CRAW SPACE ACCESS 2-0 2-0 MN- HOU DO WS SSTERM DE ANCHO -PROVIDE NEW 2 X 8 P.T. LEDGER. SECURE TO EXISTING STEM WALL WITH 5/8 CIA x 4 EMBED. AT 16" O.C. EMBED NEW FOOTING AND STEM WALL NORIZONTAL REBAR INTO EXISTING FOUNDATIONS WITH 6 MIN. EVBEDMENT IN SIMPSON SET EPOKY TYPICAL