Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Still based on the following diagram, apply the critical path method (CPM). The number in each box refers to the duratio

Post by answerhappygod »

Still based on the following diagram, apply the critical pathmethod (CPM). The number in each box refers to the duration of thistask. Which of the following is the free flow ofTask D?
Still Based On The Following Diagram Apply The Critical Path Method Cpm The Number In Each Box Refers To The Duratio 1
Still Based On The Following Diagram Apply The Critical Path Method Cpm The Number In Each Box Refers To The Duratio 1 (24.66 KiB) Viewed 22 times
note: I need solution as soon as possible
Note : Use below textbook.
Notes: Construction Management, 5th Edition
This is the primary textbook
Project Management in the Oil and Gas Industry
A ND 2 B 3 с 4 D 5 2 2 E3 F 1 G 2 3 H 4 2 K NX 2