Still based on the following diagram, apply the critical path method (CPM). The number in each box refers to the duratio

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Still based on the following diagram, apply the critical path method (CPM). The number in each box refers to the duratio

Post by answerhappygod »

Still based on the following diagram, apply the critical pathmethod (CPM). The number in each box refers to the duration of thistask. Which of the following task is NOT on thecritical path?
Still Based On The Following Diagram Apply The Critical Path Method Cpm The Number In Each Box Refers To The Duratio 1
Still Based On The Following Diagram Apply The Critical Path Method Cpm The Number In Each Box Refers To The Duratio 1 (24.66 KiB) Viewed 26 times
Note i need solution for this above question (answer thequestion as soon as possible)
Note : Use below textbook.
Notes: Construction Management, 5th Edition
This is the primary textbook
Project Management in the Oil and Gas Industry
A ND 2 B 3 с 4 D 5 2 2 E3 F 1 G 2 3 H 4 2 K NX 2