SEAA2922 WASTEWATER ENGINEERING Assignment 1 Aerated lagoon design Q1. Solve question No.39 in the tutorial section Q2.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

SEAA2922 WASTEWATER ENGINEERING Assignment 1 Aerated lagoon design Q1. Solve question No.39 in the tutorial section Q2.

Post by answerhappygod »

Seaa2922 Wastewater Engineering Assignment 1 Aerated Lagoon Design Q1 Solve Question No 39 In The Tutorial Section Q2 1
Seaa2922 Wastewater Engineering Assignment 1 Aerated Lagoon Design Q1 Solve Question No 39 In The Tutorial Section Q2 1 (40.36 KiB) Viewed 40 times
Seaa2922 Wastewater Engineering Assignment 1 Aerated Lagoon Design Q1 Solve Question No 39 In The Tutorial Section Q2 2
Seaa2922 Wastewater Engineering Assignment 1 Aerated Lagoon Design Q1 Solve Question No 39 In The Tutorial Section Q2 2 (40.36 KiB) Viewed 40 times
SEAA2922 WASTEWATER ENGINEERING Assignment 1 Aerated lagoon design Q1. Solve question No.39 in the tutorial section Q2. A sewage treatment plant consisting of an aerated lagoon and a maturation pond is designed to operate in a cold country that has a maximum temperature of 18°C. The plant is designed under the following conditions: Population equivalent (PE) = Influent BOD Surface area Depth Y b K at 20°C K₁ at 20°C 25,000 220 mg/L 4500 m² 3 m 0.65 0.07 5 per day 0.3 per day Calculate the efficiency of BOD removal in this system (Assume 65% of the solids settled in the maturation pond)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply