120 150 180 Pipe 1 210 240 Pipe 2 270 300 330 360 390 Catchment A Inlet 1 Time (min) UH (m³/s) 0 0 30 12 60 2.8 90 1.7 1

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

120 150 180 Pipe 1 210 240 Pipe 2 270 300 330 360 390 Catchment A Inlet 1 Time (min) UH (m³/s) 0 0 30 12 60 2.8 90 1.7 1

Post by answerhappygod »

120 150 180 Pipe 1 210 240 Pipe 2 270 300 330 360 390 Catchment A Inlet 1 Time Min Uh M S 0 0 30 12 60 2 8 90 1 7 1 1
120 150 180 Pipe 1 210 240 Pipe 2 270 300 330 360 390 Catchment A Inlet 1 Time Min Uh M S 0 0 30 12 60 2 8 90 1 7 1 1 (33.35 KiB) Viewed 44 times
120 150 180 Pipe 1 210 240 Pipe 2 270 300 330 360 390 Catchment A Inlet 1 Time (min) UH (m³/s) 0 0 30 12 60 2.8 90 1.7 1.4 1.2 1.1 0.91 0.74 0.61 0.50 0.28 0.17 0 Runoff Figure Q4: Layout of a drainage system of a catchment. (b) A 30-min unit hydrograph for a 2.25 km² watershed is shown in Table Q4b. Verify that this unit hydrograph corresponds to a 1-cm rainfall excess. Using this unit hydrograph, estimate the direct runoff resulting from the 90-min rainfall shown in Table Q4c. Table Q4b: 30-min unit hydrograph Catchment B Inlet 2 Table Q4c: Hyetograph of a 90-min rainfall Time (min) Excess rainfall (cm) 3.1 2.5 1.7 0-30 30-60 60-90
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply