Hi teacher, a help, to carry out the regulation and control structures to the system correctly, how should it be done? attached below the content.
Control System II Processes: cascade control, feedforward control, override control, split range control. Development: There is a two-tank filling system. Tank 1 feeds tank 2, in tank two it is required to control the temperature, maintaining a constant value of 50 °C. It must also be checked that the tanks do not overflow and do not fall below the minimum level. a1 h₂ A₁ 9m A₂ az 90 1. Create a handmade block diagram that responds to a feedforward control design that allows the proposed process to be regulated. 2. Explain and justify the proposed block diagram. 3. Create an alternative to the previous point using an override process. 4. Explain and justify the proposed block diagram.
Hi teacher, a help, to carry out the regulation and control structures to the system correctly, how should it be done? a
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am