stion 4 yet wered ed out of D ag tion A sawmill is located 15 miles away and fed at 25kV through a distribution line wit

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

stion 4 yet wered ed out of D ag tion A sawmill is located 15 miles away and fed at 25kV through a distribution line wit

Post by answerhappygod »

Stion 4 Yet Wered Ed Out Of D Ag Tion A Sawmill Is Located 15 Miles Away And Fed At 25kv Through A Distribution Line Wit 1
Stion 4 Yet Wered Ed Out Of D Ag Tion A Sawmill Is Located 15 Miles Away And Fed At 25kv Through A Distribution Line Wit 1 (38.06 KiB) Viewed 22 times
stion 4 yet wered ed out of D ag tion A sawmill is located 15 miles away and fed at 25kV through a distribution line with 1/0 ACSR construction. The peak load at the sawmill is 1500kW at 0.866 pf. There is a small (500kW and 0.95 pf) commercial enterprise outside the sawmill property, but this is the only other load on the extension. What is the current under full load (peak) on the Hydro side of the mill's transformer? 100 T 15 miles 1/0 ASCR 14.4 KW25 KV Select one: O a. 60 amps O b. About 40 amps O c. 70 amps O d. 35 amps 500 KV 0.95 pf Sa wmi 1500 KV 0.866 of
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply