A plant has two generators supplying the plant bus, and neither is operating below 100 MW or above 625 MW. Incremental c

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A plant has two generators supplying the plant bus, and neither is operating below 100 MW or above 625 MW. Incremental c

Post by answerhappygod »

A Plant Has Two Generators Supplying The Plant Bus And Neither Is Operating Below 100 Mw Or Above 625 Mw Incremental C 1
A Plant Has Two Generators Supplying The Plant Bus And Neither Is Operating Below 100 Mw Or Above 625 Mw Incremental C 1 (41.71 KiB) Viewed 42 times
A plant has two generators supplying the plant bus, and neither is operating below 100 MW or above 625 MW. Incremental costs with P1 and P2 in megawatts are: dC1₁ dP₁ dC₂ dP2 = 0.012P₁ + 8.0 $/MWh = 0.018P2 + 7.0 $/MWh For economic dispatch, find the plant incremental cost when delivering a total of 1150 MW. a) 16.45 $/MWh b) 15.88 $/MWh c) 28.25 $/MWh d) 21.75 $/MWh
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply