Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

PROJECT : CONSTRUCTION OF A WAITING SHED ACTIVITY A. EXCAVATION/STEEL BAR PREPARATION B. FOOTING REBAR INSTALLATION C. P

Post by answerhappygod »

Project Construction Of A Waiting Shed Activity A Excavation Steel Bar Preparation B Footing Rebar Installation C P 1
Project Construction Of A Waiting Shed Activity A Excavation Steel Bar Preparation B Footing Rebar Installation C P 1 (142.47 KiB) Viewed 30 times
PROJECT : CONSTRUCTION OF A WAITING SHED ACTIVITY A. EXCAVATION/STEEL BAR PREPARATION B. FOOTING REBAR INSTALLATION C. POUR CONCRETE FOR FOOTING D. COLUMN BARS/ FORMWORKS E. POUR CONCRETE FOR COLUMN F. FLOOR/WALL G. ROOF FRAME H. ROOFING I. FINISHING REQUIRED: PREDE- DURATION ES EF LS LFS CESSOR (DAYS) 2 A B B,C D D E E E.F.H 1. PREDECESSOR DIAGRAM (AON) 2. FILL UP (ES.EF.LS.LF.S) CHART 3. GANTT CHART 4. INTERPRET RESULT 1 3 3 3 3 3 1 3 I ES = S LS= A GANTT CHART 1 2 3 4 5 6 7 8 9 1 0 D EF= NAME OF ACTIVITY LF = 1 1 2 1 1 1 3 4 EF = ES + DURATION (FORWARD PASS) LS LF- DURATION (BACKWARD PASS) S = LS-ES OR_S= LF - EF 1 5 1 6 1 1 78