1-You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y = 18

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

1-You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y = 18

Post by answerhappygod »

1 You Are Hired To Install 30m Long 0 5m Diameter Concrete Piles In A Sand Deposit With The Following Parameters Y 18 1
1 You Are Hired To Install 30m Long 0 5m Diameter Concrete Piles In A Sand Deposit With The Following Parameters Y 18 1 (25.02 KiB) Viewed 31 times
1-You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y = 18.0kN/m³ p¹= 32 degrees 8' = 0.74" K = 1.5Ko Using equations 12.18, 12.42 and 12.43 find Qp and Q, for this pile. 2-A 30m pile is driven in the deposit shown below, find the following A-Q, per Meyerhof's method B-Qp per Vessic's method m-600 C-Q, per Coyle and Castello's method D-Q. (Eq 12.42 and 12.43) Sand y = 18.0kN/m³ p² = 30 degrees 8' 0.74 K=1.5K, Dense Sand Y-18.0kN/m³ p=42 degrees 30m Pile Diameter = 0.5m
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply