- The Estimated Annual Load Duration Curve To Be Met By A Boiler Plant Is Shown Below Load Mw 0 8 0 6 0 4 0 2 O 2000 Lo 1 (43.19 KiB) Viewed 27 times
The estimated annual load duration curve to be met by a boiler plant is shown below. Load (MW) 0.8 0.6 0.4 0.2 O 2000 Lo
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
The estimated annual load duration curve to be met by a boiler plant is shown below. Load (MW) 0.8 0.6 0.4 0.2 O 2000 Lo
The estimated annual load duration curve to be met by a boiler plant is shown below. Load (MW) 0.8 0.6 0.4 0.2 O 2000 Load Duration Curve 4000 Hour Number 6000 8000 8760 hrs Estimate the annual fuel use of the boiler plant (MWh) if it operates with seasonal efficiency = 84%.