Consider the overflow spillway shown in figure. The design spillway discharge is computed as Q=210 m/s. The total crest

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Consider the overflow spillway shown in figure. The design spillway discharge is computed as Q=210 m/s. The total crest

Post by answerhappygod »

Consider The Overflow Spillway Shown In Figure The Design Spillway Discharge Is Computed As Q 210 M S The Total Crest 1
Consider The Overflow Spillway Shown In Figure The Design Spillway Discharge Is Computed As Q 210 M S The Total Crest 1 (46.14 KiB) Viewed 20 times
Consider the overflow spillway shown in figure. The design spillway discharge is computed as Q=210 m/s. The total crest length of the spillway is 10 m. The approach channel stilling basin and downstream section are of rectangular cross-section having 10 m. There are two rounded nosed piers, each one-meter thick. Headwalls of rounded abutments makes angle less than 45 with the flow direction. Ignoring the head losses over the spillway and over a possible downstream end sill, determine: a) The design spillway head; b) The required lowering of the tiver bed for the stilling basin; and c) The type and dimensions of the stilling basin. 118 m f 113 m 108 m 108 m
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!