The Texas Department of Transportation (TxDOT) is considering two designs for crash barriers along a reconstructed porti

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The Texas Department of Transportation (TxDOT) is considering two designs for crash barriers along a reconstructed porti

Post by answerhappygod »

The Texas Department Of Transportation Txdot Is Considering Two Designs For Crash Barriers Along A Reconstructed Porti 1
The Texas Department Of Transportation Txdot Is Considering Two Designs For Crash Barriers Along A Reconstructed Porti 1 (42.94 KiB) Viewed 32 times
The Texas Department of Transportation (TxDOT) is considering two designs for crash barriers along a reconstructed portion of 1-10. Design 2B will cost $3 million to install and $144,000 per year to maintain. Design 4R will cost $3.7 million to install and $55,000 per year to maintain. Determine which design should be selected based on a rate of return analysis if TxDOT uses a MARR of 6% per year and a 20-year project period. The rate of return is %. Design (Click to select) is selected. (Click to select) 4R 2B *******