Develop an operating characteristic (OC) curve for a sampling
plan in which a sample of 10 items is drawn from lots of 500 items.
The accept/reject criteria are set up in such a way that we accept
a lot if no more than 4 defects is found. Then, calculate the AOQ
values and construct the AOQ curve to find the AOQL.
Develop an operating characteristic (OC) curve for a sampling plan in which a sample of 10 items is drawn from lots of 5
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am