MON Case : Observations (in minutes) Performance Job Element 4 5 Rating (A) 8 10 21* 11 120% (B) 3 1 3 105% (C) 2 1 2 1

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

MON Case : Observations (in minutes) Performance Job Element 4 5 Rating (A) 8 10 21* 11 120% (B) 3 1 3 105% (C) 2 1 2 1

Post by answerhappygod »

Mon Case Observations In Minutes Performance Job Element 4 5 Rating A 8 10 21 11 120 B 3 1 3 105 C 2 1 2 1 1
Mon Case Observations In Minutes Performance Job Element 4 5 Rating A 8 10 21 11 120 B 3 1 3 105 C 2 1 2 1 1 (136.58 KiB) Viewed 31 times
MON Case : Observations (in minutes) Performance Job Element 4 5 Rating (A) 8 10 21* 11 120% (B) 3 1 3 105% (C) 2 1 2 1 110% 1. Delete all unusual or nonrecurring observations, such as those marked with an asterisk. (They might be due to an unscheduled business interruption, a conference with the boss, or a mistake of an , a unusual nature; these are not part of the job). 2. Compute the average cycle time for each job element. . 8 + 10 + 9 + 11 + + 9 Average time for A = A = 9.5 minutes 2+ +2+ 2 + 3 + 2 + 1 + 3 5 Average time for B 2.2 minutes 2 + 1 + 2 + 1 1 2 + Average time for C- C- 4 1.5 minutes 3. Compute the normal time for each job element. Normal time for A = (average time) x (rating) ) = (9.5) (1.20) 11. 4 minutes Normal time for B = (2.2) (1.05) = 2. 31 minutes Normal time for C = (1.5) (1.10) 1. 65 minutes Normal times are computed for each element because the rating factor may vary for each element, which it , did in this case. . 4. Add the normal times for each element to find the total normal time (the normal time for the whole job). Total normal time – 11.40 + 2.31 + 1.65 = 15.36 minutes = + 5. Compute the standard time for the job. total normal time 15.36 Standard time = 18.07 minutes 1 - allowance factor 1 0.15 1 - Thus 18.07 minutes is the time standard for this job.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply