2 [-/20 Points] DETAILS ASWMSCI15 9.E.008. MY NOTES ASK YOUR TEACHER Colonial State College is considering building a ne

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

2 [-/20 Points] DETAILS ASWMSCI15 9.E.008. MY NOTES ASK YOUR TEACHER Colonial State College is considering building a ne

Post by answerhappygod »

2 20 Points Details Aswmsci15 9 E 008 My Notes Ask Your Teacher Colonial State College Is Considering Building A Ne 1
2 20 Points Details Aswmsci15 9 E 008 My Notes Ask Your Teacher Colonial State College Is Considering Building A Ne 1 (24.49 KiB) Viewed 12 times
2 20 Points Details Aswmsci15 9 E 008 My Notes Ask Your Teacher Colonial State College Is Considering Building A Ne 2
2 20 Points Details Aswmsci15 9 E 008 My Notes Ask Your Teacher Colonial State College Is Considering Building A Ne 2 (25.62 KiB) Viewed 12 times
2 [-/20 Points] DETAILS ASWMSCI15 9.E.008. MY NOTES ASK YOUR TEACHER Colonial State College is considering building a new multipurpose athletic complex on campus. The complex would provide a new gymnasium for intercollegiate basketball games, expanded office space, classrooms, and intramural facilities. The following activities would have to be undertaken before construction can begin. Activity A B C D E F G H Description Survey building site Develop initial design Obtain board approval Select architect Establish budget Finalize design Obtain financing Hire contractor Immediate Predecessor A, B C C D, E E 7,0 (c) Develop the activity schedule for the project. Time (weeks) 5 . 12 4 7 13 11 . (a) Draw a project network (Submit a file with a maximum size of 1 MB.) Choose Fie No tie chosen The answer has not been graded yel (b) Identify the critical path (Enter your answers as a comma-separated list.) PRACTICE ANOTHER
(a) Draw a project network. (Submit a file with a maximum size of 1 MB.) Choose File No fie chosen This answer has not been graded yet (b) Identify the critical path. (Enter your answers as a comma-separated list.) (c) Develop the activity schedule for the project. Latest Earliest Start Start Activity A e U D E F G H Earliest Finish Latest Finish Slack (d) Does it appear reasonable that construction of the athletic complex could begin one year after the decision to begin the project with the site survey and initial design plans? What is the expected completion time for the project? The expected completion time is weeks, which is than 1 year