TASKS 1. Considered the following table. All estimated duration times are in days, and the network proceeds from Node 1

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

TASKS 1. Considered the following table. All estimated duration times are in days, and the network proceeds from Node 1

Post by answerhappygod »

Tasks 1 Considered The Following Table All Estimated Duration Times Are In Days And The Network Proceeds From Node 1 1
Tasks 1 Considered The Following Table All Estimated Duration Times Are In Days And The Network Proceeds From Node 1 1 (110.51 KiB) Viewed 9 times
2. Enter the information from previous task into MSProject. View the network diagram and critical task report to seethe critical path. Generate the network diagram view and criticaltask report.
TASKS 1. Considered the following table. All estimated duration times are in days, and the network proceeds from Node 1 to Node 7: Activity Initial Node Final Node 2 3 4 A BCDEFGHI с J 1 1 1 Estimated Duration 2 2 3 4 2234556 5356677 53632 2 a) Draw an AOA network diagram representing the project. Put the node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated time. b) Identify ALL of the paths on the network diagram and note how long they are. (Use Figure 6.8 in textbook as a guide for how to represent each path). c) What is the critical path for this project and how long is it? d) What is the shortest possible time needed to complete this project?