Please help with the following

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Please help with the following

Post by answerhappygod »

Please help with the following
Please Help With The Following 1
Please Help With The Following 1 (57.74 KiB) Viewed 12 times
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 4 clamps. The base is assembled from 2 clamps and 1 housing. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 2 shafts. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. Number Hom Spring(1) || Housing(1) III IV Shaft) Casting (2) Clamp (2) Handle(1) units (enter your response as a whole number). Base: Spring: units (enter your response as a whole number). units (enter your response as a whole number). Clamp: Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number). Base (1) b) Determine the gross quantities needed of each item if you are to assemble 125 brackets. Click the icon to view the completed product structure. Bracket |thessaring(1) 11 IV I Clamp (4) Handle(1) Casting(2)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply