An initial time study was done on a process with the following results (in minutes). Based on the data obtained so far,

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

An initial time study was done on a process with the following results (in minutes). Based on the data obtained so far,

Post by answerhappygod »

An Initial Time Study Was Done On A Process With The Following Results In Minutes Based On The Data Obtained So Far 1
An Initial Time Study Was Done On A Process With The Following Results In Minutes Based On The Data Obtained So Far 1 (93.43 KiB) Viewed 12 times
An initial time study was done on a process with the following results (in minutes). Based on the data obtained so far, assuming an allowance of 21 percent of the normal time, what do you estimate for the time per customer served, based on this preliminary sample? (Round all intermediate calculations to two decimal places.) The time per unit customer served is Element Element 1 Element 2 Element 3 Performance Rating 70 120 90 minutes. (Enter your response rounded to two decimal places.) Obs Obs 2 387 396 Obs Obs 3 4 4 10 6 ∞ ∞00 8 8 Obs 5 6 9 6 P
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply