- As The Production Planner For Xiangling Hu Products Inc You Have Been Given A Bill Of Material For A Bracket That Is 1 (19.08 KiB) Viewed 13 times
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 2 clamps and 1 housing. Each clamp has 1 handle and 1 casting. Each housing has 1 bearing and 1 shaft. There is no inventory on hand a) Design a product structure noting the quantities for each item and show the low-level coding Match each number in the structure below with the corresponding item. Number 1 11 IV item Clamp Handle(1) III Baw (1) Bracket Bearing(1) 11 IV Clamp Handle (1) Casting (1) N