Problem 4-21 (Algorithmic) Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manuf

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem 4-21 (Algorithmic) Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manuf

Post by answerhappygod »

Problem 4-21 (Algorithmic)
Greenville Cabinets received a contract to produce speakercabinets for a major speaker manufacturer. The contract calls forthe production of 5,100 bookshelf speakers and 5,900 floor speakersover the next two months, with the following delivery schedule:
Greenville estimates that the production time for each bookshelfmodel is 0.6 hour and the production time for each floor model is 1hour. The raw material costs are $19 for each bookshelf model and$21 for each floor model. Labor costs are $31 per hour usingregular production time and $42 using overtime. Greenville has upto 3,300 hours of regular production time available each month andup to 1,900 additional hours of overtime available each month. Ifproduction for either cabinet exceeds demand in month 1, thecabinets can be stored at a cost of $14 per cabinet. For eachproduct, determine the number of units that should be manufacturedeach month on regular time and on overtime to minimize totalproduction and storage costs. If required, round your answers tothe nearest whole number.
Problem 4 21 Algorithmic Greenville Cabinets Received A Contract To Produce Speaker Cabinets For A Major Speaker Manuf 1
Problem 4 21 Algorithmic Greenville Cabinets Received A Contract To Produce Speaker Cabinets For A Major Speaker Manuf 1 (48.6 KiB) Viewed 3 times
Problem 4-21 (Algorithmic) Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 5,100 bookshelf speakers and 5,900 floor speakers over the next two months, with the following delivery schedule: Model Bookshelf Floor Greenville estimates that the production time for each bookshelf model is 0.6 hour and the production time for each floor model is 1 hour. The raw material costs are $19 for each bookshelf model and $21 for each floor model. Labor costs are $31 per hour using regular production time and $42 using overtime. Greenville has up to 3,300 hours of regular production time available each month and up to 1,900 additional hours of overtime available each month. If production for either cabinet exceeds demand in month 1, the cabinets can be stored at a cost of $14 per cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs. If required, round your answers to the nearest whole number. Model Bookshelf Floor Month 1 Month 2 3,000 2,100 2,400 3,500 Model Bookshelf Floor Regular Time Manufacture Month 1 Month 2 Overtime Manufacture Month 1 Month 2
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply