5- Consider the following data about handling two different machines by one operator: Loading the turning machine: 3 min

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

5- Consider the following data about handling two different machines by one operator: Loading the turning machine: 3 min

Post by answerhappygod »

5 Consider The Following Data About Handling Two Different Machines By One Operator Loading The Turning Machine 3 Min 1
5 Consider The Following Data About Handling Two Different Machines By One Operator Loading The Turning Machine 3 Min 1 (85.48 KiB) Viewed 9 times
5- Consider the following data about handling two different machines by one operator: Loading the turning machine: 3 minutes - Automated operation by the turning machine: 12 minutes Unloading the turned part: 2 minutes Loading the drilling machine: 3 minutes Automated operation by the drilling machine: 8 minutes Unloading the drilled part: 2 minutes Going between the two machines is assumed to be 0.5 minutes and inspection time of the drilled or turned part is 1 minute. It is desired to: a. The cycle time b. Idle time of the operator in each cycle C. What is the percentage of idleness of drilling machine d. Draw the man-machine chart for this operation assuming that the turning machine to be the number 1 and the drilling machine to be the number 2
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply