- The Following Table Details The Tasks Required For Indiana Based Frank Pianki Industries To Manufacture A Fully Portable 1 (289.05 KiB) Viewed 10 times
The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable
The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 11 minutes. Activity Activity Description A Attach wheels to tub Attach motor to lid Attach battery pack Attach safety cutoff Attach filters Attach lid to tub BCD с E F G H I J Assemble attachments Function test Final inspection Packing Performance Time (mins) 4.0 1.6 3.0 3.6 3.0 2.0 3.0 3.7 2.0 2.0 Predecessors IBCB с A, E D, F, G H 1 a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2. The efficiency of the assembly line with 3 workstations = 84.54 % (enter your response rounded to two decimal places). A B B A B G E E F H Fig. 1 Fig. 2 Fig. 3