The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable

Post by answerhappygod »

The Following Table Details The Tasks Required For Indiana Based Frank Pianki Industries To Manufacture A Fully Portable 1
The Following Table Details The Tasks Required For Indiana Based Frank Pianki Industries To Manufacture A Fully Portable 1 (289.05 KiB) Viewed 10 times
The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 11 minutes. Activity Activity Description A Attach wheels to tub Attach motor to lid Attach battery pack Attach safety cutoff Attach filters Attach lid to tub BCD с E F G H I J Assemble attachments Function test Final inspection Packing Performance Time (mins) 4.0 1.6 3.0 3.6 3.0 2.0 3.0 3.7 2.0 2.0 Predecessors IBCB с A, E D, F, G H 1 a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2. The efficiency of the assembly line with 3 workstations = 84.54 % (enter your response rounded to two decimal places). A B B A B G E E F H Fig. 1 Fig. 2 Fig. 3
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply