a) Given the following data: Determine the percentage idle time.? (2 points) Cycle time = 5.1 min Station # 1 2 3 4 Stat

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

a) Given the following data: Determine the percentage idle time.? (2 points) Cycle time = 5.1 min Station # 1 2 3 4 Stat

Post by answerhappygod »

A Given The Following Data Determine The Percentage Idle Time 2 Points Cycle Time 5 1 Min Station 1 2 3 4 Stat 1
A Given The Following Data Determine The Percentage Idle Time 2 Points Cycle Time 5 1 Min Station 1 2 3 4 Stat 1 (44.07 KiB) Viewed 15 times
a) Given the following data: Determine the percentage idle time.? (2 points) Cycle time = 5.1 min Station # 1 2 3 4 Station time (min) 4.2 4.7 4.4 4.8 b) The following diagram shown below describes a service process where customers go through either of two parallel three steps and then merge into single line for two final steps. Capacity of each step shown on the diagram. i) What is the current capacity of the entire process? (1 point) ii) If you could increase the capacity of only one operation through process improvement efforts, which operation would you select and how much additional capacity would you strive for? (1 point) iii) What would be the resulting capacity of the process? (1 point) 15/hr 5/ hr 10/hr 8/ hr 20/hr 12/hr 34/hr 30/h