Wilmington Company has two manufacturing departments-Assembly and Fabrication. It considers all of its manufacturing ove
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Wilmington Company has two manufacturing departments-Assembly and Fabrication. It considers all of its manufacturing ove
Company has two manufacturing departments-Assembly and Fabrication. It considers all of its manufacturing overhead costs to be fixed costs. The first set of data that is shown below is based on estimates from the beginning of the year. The second set of data relates to one particular job completed during the year-Job Bravo. Estimated Data Manufacturing overhead costs Direct labor-hours Machine-hours Job Bravo Direct labor-hours Machine-hours Assembly $ 1,920,000 Assembly Fabrication 17 9 9 80,000 32,000 12 Fabrication $2,240,000 48,000 160,000 Total 26 21 1. Plantwide manufacturing overhead applied to Job Bravo 2 Manufacturing overhead applied from Assembly to Job Bravo : 2 Manufacturing overhead applied from Fabrication to Job Bravo 2 Total departmental manufacturing overhead applied to Job Bravo Total $ 4,160,000 128,000 192,000 Required: 1. If Wilmington used a plantwide predetermined overhead rate based on direct labor-hours, how much manufacturing overhead would be applied to Job Bravo? 2. If Wilmington uses departmental predetermined overhead rates with direct labor-hours as the allocation base in Assembly and machine-hours as the allocation base in Fabrication, how much manufacturing overhead would be applied to Job Bravo? (Round your intermediate calculation to 2 decimal places.)
Wilmington