There are two questions included below for the data given. Make sure to answer both questions. 9 to​ 5, LLC, a manufactu

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

There are two questions included below for the data given. Make sure to answer both questions. 9 to​ 5, LLC, a manufactu

Post by answerhappygod »

There are two questions included below for the data given. Make sure to answer both questions.
9 to​ 5, LLC, a manufacturer of​ typewriters, uses the weighted average method in its process costing system. The company allocates manufacturing overhead to production at a rate of​ $6 per direct labor hour using a​ traditional, normal costing system.
In its first production​ department, assembly, all direct material is added at the beginning of the production process and conversion costs are incurred uniformly throughout the production process. On July​ 31st, 8,000​ typewriters, 75% complete with respect to conversion​ costs, were in the assembly​ department’s work in process inventory. These units were assigned total costs of​ $27,780 on the July production cost​ report, $3,780 of which was for conversion costs.
​120,000 typewriters were started during August. At the end of​ August, 10,000 typewriters were still in production in the assembly department. These units were​ 80% complete with respect to the conversion process. The following additional data are available for the​ department’s August​ activities:
Direct Materials Requisitioned
​$371,520
Direct Labor Costs​ Incurred*
​$43,560
​*The direct labor wage rate was​ $18.15 per direct labor hour.
Question 1 What was the cost to assemble one typewriter in​ July?
A.
​$3.63
B.
​$3.47
C.
​$4.85
D.
​$3.58
E.
​$3.68
Question 2 What was the conversion cost included in work in process​ – assembly on September​ 1st?
A.
​$4,823
B.
​$4,900
C.
​$3,920
D.
​$3,690
E.
​$5,040