Troubleshooting Scenario 1 Refer to Figure 15-6 and select the best answer to the what-if scenarios. TIC-210 Fails 25%
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Troubleshooting Scenario 1 Refer to Figure 15-6 and select the best answer to the what-if scenarios. TIC-210 Fails 25%
TIC-210 Fails 25% open AIC-210 1 PIC-210 1 operating % 11-11- Circle Correct Response! 38% Liquid Catalyst 14 gal 61% Butane 22.1 gal. 1% Pentane 4 gal. Liq-Cat/Pentane/Butane (Feed) BO FE FT AT 4 61% AUTO FIC 210 FC SP 136.5 gpm py 36.5 gpm OP% 25% 1 SP 75% PV 75% OP 75% Reactor-202 SP Figure 15-6 Reactor Scenario 1 LA 210 Lowon P-210A/B PV OP% 25% 185 psl 165 psig LIC 210 PA 210 Low 15 30 LR 210 PIC 210 PT PE PR 110 SIC-210 Falls erratic rotation-100-250 rpm 8 SP 250 rpm PV 250 rpm Mixer-210 OP 25% SIC 210 ST TEXTT 130 psiga 88 psig 20 V-208 Water D- AIC-210 1 LIC-210 1 F-210 I 11-11-11- Circle Correct Responsel TIC 210, P-210 Troubleshooting Scenario 3 ******* FIC 211 LIFT 25 Cuft/min 210 210 HINY FT fil Feed (Solvent) SP 120°F PAV Py 120°F OP 5096 SP 168 pm PV de opm OPM 50% ------ V-205 Flare DO-D V-204 V 206 Butane SP 21% PV 21% www. OP%1 50% 16259 FAA 210 AIC 210/ Son 17 AEX AT To Separator-600 1049 gồm AR 216 371