14.3. An earthen embankment of 106 m³ volume is to be constructed with a soil having a void ratio of 0.80 after compacti

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

14.3. An earthen embankment of 106 m³ volume is to be constructed with a soil having a void ratio of 0.80 after compacti

Post by answerhappygod »

14 3 An Earthen Embankment Of 106 M Volume Is To Be Constructed With A Soil Having A Void Ratio Of 0 80 After Compacti 1
14 3 An Earthen Embankment Of 106 M Volume Is To Be Constructed With A Soil Having A Void Ratio Of 0 80 After Compacti 1 (16.64 KiB) Viewed 18 times
14.3. An earthen embankment of 106 m³ volume is to be constructed with a soil having a void ratio of 0.80 after compaction. There are three borrow pits marked A, B and C, having soils with void ratios of 0.90, 1.50 and 1.80, respectively. The cost of excavation and transporting the soil is Rs. 0.25, Rs. 0.23 and Rs. 0.18 per respectively. Calculate the volume of soil to be excavated from each pit. Which borrow bit is the mos (Ans. 1.055 x 10; 1.389 x 10; 1.555 x 106 m²: A economical? (G= 2.65).
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply