It is very important to have a thorough reading and understanding of project outline provided. However, poor reading wil
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
It is very important to have a thorough reading and understanding of project outline provided. However, poor reading wil
questions are to be answered. Therefore, in-depth understanding the outline is very important. PROJECT REQUIREMENTS: Meet with your group to develop a case study for any system such as enrollment, hospital, transportation, food delivery... etc. Use any data you have subsequently generated with your group about the system you choosed. (Hint: Concentrate on one of the company's functional areas rather than try to model the entire organization.) Using the context-level diagram developed in Problem 1, develop with your group a level o logical data flow diagram for the system. Make any assumptions necessary to draw it. List them. • Draw ER-Diagram for the selected case study Documentation Format: • All paragraphs must be justified and use double spacing, • Information can include proper diagram and pictures wherever necessary with table or figure numbering, • The entire document should be in Arial 12 pt. • All section headings must be in Arial 12 pt bold. • Include proper cover page with Project name, group members Name, ID and Section
It is very important to have a thorough reading and understanding of project outline provided. However, poor reading will lead to misunderstanding and failure of analyses. It is recommended to read guidelines before and after reading the proposed case study to understand what is asked and how the