Rate Cost 1. Project Start at 11/15/2022 2. Set Thanksgiving break (11/23-11/25), Christmas break (12/22-12/23), New Yea

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Rate Cost 1. Project Start at 11/15/2022 2. Set Thanksgiving break (11/23-11/25), Christmas break (12/22-12/23), New Yea

Post by answerhappygod »

Rate Cost 1 Project Start At 11 15 2022 2 Set Thanksgiving Break 11 23 11 25 Christmas Break 12 22 12 23 New Yea 1
Rate Cost 1 Project Start At 11 15 2022 2 Set Thanksgiving Break 11 23 11 25 Christmas Break 12 22 12 23 New Yea 1 (74.93 KiB) Viewed 24 times
This has to be done through MS Project
Rate Cost 1. Project Start at 11/15/2022 2. Set Thanksgiving break (11/23-11/25), Christmas break (12/22-12/23), New Year's Day (12/31) 3. Change type of task. 4. Create project plan cannot finish until Obtain approval of Statement of Work finishes 5. Request test files from integrator can start after Install printer hardware starts 6. We can only Obtain approval of project plan on Monday. 7. Create resource. Type Group Overtime per use Patrick Rierdon Work Project Manager $150.00/hr $180.00/hr $0.00 Software License Material $80.00 $100.00 Travel Analyst Work $80.00/hr $100.00/hr $0.00 Designer Work $80.00/hr $100.00/ht $0.00 Susan Smith Work Project Manager $150.00/hr $180.00/ht| $0.00 8. Analyst has different rate for different task. When applying for Run integrated processes on the server, Analyst has $100/hr and $120/hr for standard rate and overtime rate. 9. Assign resources to task. (see 2nd page) 10. Set a column to see how much days we can delay a task (different from start date and latest start date) 11. Solving overallocated resources for uncritical tasks with leveling option 12. Solving overallocated resources for critical tasks by setting overtime work. 13. A11 Cost and Material Resources are calculated by Start Type 14. All costs from Project manager are calculated by End Type 15. Create a budget for project manager with $16.000
Resource Units cost Build Project Plan Create Statement of Work Obtain approval of Statement of Work Create project plan Susan Smith Patrick Rierdon Patrick Rierdon Software License Travel Patrick Rierdon 100% 100% 100% 2 $3,000 100% Obtain approval of project plan Finalize project plan and definition Set Up System Environment Test/verify all programs Run integrated processes on the server Install printer hardware Request test files from integrator Analyst Analyst Designer Designer Analyst Designer Designer 100% 100% 100% 100% 100% 50% 100% Test printer hardware with test files Build Project Plan Create Statement of Work Obtain approval of Statement of Work Create project plan Obtain approval of project plan Finalize project plan and definition - Set Up System Environment Test/verify all programs Run integrated processes on the server Install printer hardware Request test files from integrator Test printer hardware with test filer #18 Fixed Duration Fixed Duration Fixed Duration Fixed Work Fixed Duration Fixed Work Fixed Duration Fixed Work Fixed Work Fixed Work Fixed Duration xed Duration 13 days 8 days 1 day 3 days 1 day 0 days 13 days 6 days 3 days 3 days 3 days 1 day 描自动生成 11/19