The MRP gross requirements for product A in the next 12 weeks are shown in the following table. The lead time for A is t

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The MRP gross requirements for product A in the next 12 weeks are shown in the following table. The lead time for A is t

Post by answerhappygod »

The Mrp Gross Requirements For Product A In The Next 12 Weeks Are Shown In The Following Table The Lead Time For A Is T 1
The Mrp Gross Requirements For Product A In The Next 12 Weeks Are Shown In The Following Table The Lead Time For A Is T 1 (74.18 KiB) Viewed 35 times
The Mrp Gross Requirements For Product A In The Next 12 Weeks Are Shown In The Following Table The Lead Time For A Is T 2
The Mrp Gross Requirements For Product A In The Next 12 Weeks Are Shown In The Following Table The Lead Time For A Is T 2 (64.94 KiB) Viewed 35 times
The Mrp Gross Requirements For Product A In The Next 12 Weeks Are Shown In The Following Table The Lead Time For A Is T 3
The Mrp Gross Requirements For Product A In The Next 12 Weeks Are Shown In The Following Table The Lead Time For A Is T 3 (60.61 KiB) Viewed 35 times
The MRP gross requirements for product A in the next 12 weeks are shown in the following table. The lead time for A is two weeks, and the setup cost is $200. The carrying cost is $0.3 per unit per day. Suppose the initial inventory at the beginning of week 1 is 130 units. Gross 4 Lot for lot Planned order receipts Least Total Cost requirements 70 40 20 50 90 80 100 30 60 80 Questions: Planned order receipts 14 Least Unit Cost P 24 34 4 Planned order receipts 14 2 3+ 14 2 3 14 2 54 (1) Determine for what quantity the order should be planned to be received for each week using the following three lot-sizing methods: lot-for-lot, least total costs, and least unit cost. Hint: production should be scheduled when the initial inventory are all consumed. (3 marks for each lot-sizing methods) دیا Week 6 44 st Week 5 74 8 6 Weeke 5 6 Week 44 5 6 74 74 € 74 8 00 8 94 00 8 10 94 4 94 90+ 94 10 114 10 € 50€ 4 104 114 11 114 124¹ 4 2 124 e P 124 42 124 4²
(2) The product structure diagram for producing item A is given as follows. 4 C (2) The beginning inventory in week 1 for item B and C are 100 units and 150 units respectively. The lead time for both item B and item C is one week. There are 50 units of item B scheduled to be received at the beginning of week 2 and 100 units of item C scheduled to be received at the beginning of week 4. A Suppose A is produced based on the lot-for-lot method, and B and C are produced in batches with a fixed batch size of 100 units and 150 units respectively. Complete the MRP schedule for A, B, and C in the following tables. (4 marks for A; 6 marks for B; 6 marks for C)< Lead time= 2 weeks On hand 130 units Order quantity= lot for lote Safety stock <-00 Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipts Planned 1 42 + 3 3 2 B (1) 3 2 3 2 36 (2 22 t t 4 4 2 2 t Weeke 5 42 C (2) 1 3 6 2 7 42 2 2 P 2 86 e 23 2 9 4 +3 t t P 10 41 11 67 7 t 2 to e 12 2 2 3 16-2 7 2 2
Bel Lead time- 1 week requirements On hand Scheduled -100 units receipts Order quantity= Projected on 100 units hand Safety stock Net Scheduled receipts 50 units (week 2) 6 CH Lead time= 1 week On hand= 150 units Order quantity- 150 units Gross Scheduled receipts 100 units (week 4) requirements Projected on hand Safety stock Net -0 Planned order receipts d Planned order releases 43 Gross requirements Scheduled receipts requirements 43 Planned order receipts Planned order releases + e e a P 3 4 47 t t # t 4 e → + 43 6 47 To t 6 47 2 L P P e P 2 P 2 2 2 t 2 to 7 2 2 to t e 7 a 2 7 A 13 23 10 P t n 13 43 12 7. t L
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!