Multiple Choice Select the Best Answer for Each Question. 3 Points Each 1. What is typically included in a “fully burden

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Multiple Choice Select the Best Answer for Each Question. 3 Points Each 1. What is typically included in a “fully burden

Post by answerhappygod »

Multiple Choice Select The Best Answer For Each Question 3 Points Each 1 What Is Typically Included In A Fully Burden 1
Multiple Choice Select The Best Answer For Each Question 3 Points Each 1 What Is Typically Included In A Fully Burden 1 (114.46 KiB) Viewed 37 times
Multiple Choice Select the Best Answer for Each Question. 3 Points Each 1. What is typically included in a “fully burdened” labor rate for a tradesperson working for a subcontractor? a. Cost of workers comp insurance b. Base wage rate c. Subcontractor's profit d. Subcontractors home office overhead e. All of the above f. (a) and (b) above 2. Builder's risk insurance does not cover: a. b. c. d. Damage to adjacent properties caused by the construction process A building that burns down during construction. Copper wire stolen from the jobsite. Broken glass caused by storm-blown debris. It covers all of the above (a), and (c) above. e. f. 3. General Contractors perform take-offs in order to: a. b. c. Prepare a budget estimate for an Owner Prepare a schedule for an Owner Understand project scope All of the above (a) and (c) above d. e
8. Using the scale printed on a set of drawings, you measure the distance between two walls on a set of plans to be 25'-0" using an architects' scale. The dimension printed on the drawings shows the distance between these walls as 50 -0". The drawings are printed at size. What is the actual scale of the drawings as they are printed? a. b. C. d e. couco 1/4" = 1-0" 1:2 1/8" = 1'-0" 1:10 Cannot be determined from the information above. 9. The two largest components of a subcontractor's costs are typically: a. b. c. . e. ਨੂੰ ਹੈ Taxes and Insurance Manufactured Components and Materials Delivered to Site Manufactured Components and Field Labor Installation and Field Labor Overhead and Profit 10. A GC is preparing and a budget for a 360,000sf office building. A recent bid for a 150,000sf office building may not be a suitable comparison for this budget because: a. b. c. d. e. f. The smaller building may have different systems than the larger building The larger building may have a lower S/sf due to efficiencies in construction and design The larger building may have a higher architectural fee The average on-site labor costs (s/hour) will be higher for the larger building All of the above (a) and (b) above
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply