(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1

Post by answerhappygod »

A The Total Cost For Treating Material Containing 1 Copper And 0 015 Molybdenum Is 18 50 T At A Copper Price Of 1 1
A The Total Cost For Treating Material Containing 1 Copper And 0 015 Molybdenum Is 18 50 T At A Copper Price Of 1 1 (30.03 KiB) Viewed 14 times
(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1800/t and molybdenum price of $22.50/kg, determine whether the deposit can be classified as ore or not. 10000 2 5mm and that after grinding
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply