- A The Total Cost For Treating Material Containing 1 Copper And 0 015 Molybdenum Is 18 50 T At A Copper Price Of 1 1 (30.03 KiB) Viewed 14 times
(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1
(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1800/t and molybdenum price of $22.50/kg, determine whether the deposit can be classified as ore or not. 10000 2 5mm and that after grinding