2 SULIT (c) According to Figure B1(a) & Figure B1(b), calculate the cost of the building using the Cubic Content Method.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

2 SULIT (c) According to Figure B1(a) & Figure B1(b), calculate the cost of the building using the Cubic Content Method.

Post by answerhappygod »

2 Sulit C According To Figure B1 A Figure B1 B Calculate The Cost Of The Building Using The Cubic Content Method 1
2 Sulit C According To Figure B1 A Figure B1 B Calculate The Cost Of The Building Using The Cubic Content Method 1 (68.95 KiB) Viewed 27 times
2 SULIT (c) According to Figure B1(a) & Figure B1(b), calculate the cost of the building using the Cubic Content Method. The price rate given is RM 525.00/m³. Berdasarkan kepada Rajah B1(a) & Rajah B1(b), kirakan kos bangunan dengan menggunakan Kaedah Isipadu Bangunan. Kadar harga yang diberikan adalah RM 525.00/m³. 225 1.80m 11.20 m Area A 18 thick brickwall Ground Level Note: Full pitch Rasfubare the roof Area is usable space. Bumbung curam pernah dimana ruang kumbang adalah ruang yang boleh digunakan Tank Full pitch roof section DCC2073: CONTRACT AND ESTIMATING. 3.80 m Figure B1(a): Floor Plan/ Rajah B1(a): Plan Lantai Area B 45¹ 5 2500 mm 7500 mm T=2.10m [10 marks] [10 markah] H=3.50 m Figure B1(b): Cross Section /Rajah B1(a): Keratan SULIT
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply