(b) By referring to Figure B3(a), calculate the quantity of earthwork to be cut and fill using a Triangle method. Meruju

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(b) By referring to Figure B3(a), calculate the quantity of earthwork to be cut and fill using a Triangle method. Meruju

Post by answerhappygod »

B By Referring To Figure B3 A Calculate The Quantity Of Earthwork To Be Cut And Fill Using A Triangle Method Meruju 1
B By Referring To Figure B3 A Calculate The Quantity Of Earthwork To Be Cut And Fill Using A Triangle Method Meruju 1 (51.01 KiB) Viewed 28 times
(b) By referring to Figure B3(a), calculate the quantity of earthwork to be cut and fill using a Triangle method. Merujuk kepada Rajah B3(a), kirakan kuantiti kerja tanah yang perlu dipotong dan ditambak menggunakan kaedah Tiga Segi. Given/ Diberi: SULIT i. Interval is 10 m Sela 10 m ii. Formation level is 150.0 m Aras pembentukan150.0 m iii. Top Soil is 150 mm. Tanah permukaan 150 mm A B C D 1 2 150.00 151.50 DCC2073: CONTRACT AND ESTIMATING 3 150.35 4 151.20 151.00 151.20 148.52 150.50 151.40 149.20 149.52 150.85 Figure B3(a): Grid Layout Rajah B3(a):Susunatur Grid 151.75 148.25 147.52 150.85 [10 marks] [10 markah]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply