- 2 Draw The Following Network And Perform The Cpm Calculations 4 Points Activity Duration Ipa Type Rel Lag Es Ef Ls A 1 (72.69 KiB) Viewed 32 times
2. Draw the following network and perform the CPM calculations: (4 points) Activity Duration IPA Type Rel Lag ES EF LS A
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
2. Draw the following network and perform the CPM calculations: (4 points) Activity Duration IPA Type Rel Lag ES EF LS A
2. Draw the following network and perform the CPM calculations: (4 points) Activity Duration IPA Type Rel Lag ES EF LS A B C D F G 5 7 8 10 4 6 2 A A A B C,D E,F SS SS FF FF 2 3 2 LF TF FF