Answer correct and with full steps. Otherwise do not attempt!!

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Answer correct and with full steps. Otherwise do not attempt!!

Post by answerhappygod »

Answer correct and with full steps. Otherwise do
not attempt!!
Answer Correct And With Full Steps Otherwise Do Not Attempt 1
Answer Correct And With Full Steps Otherwise Do Not Attempt 1 (67.76 KiB) Viewed 48 times
Answer Correct And With Full Steps Otherwise Do Not Attempt 2
Answer Correct And With Full Steps Otherwise Do Not Attempt 2 (187.12 KiB) Viewed 48 times
These problems assume that we are using a processor with a 15-stage pipeline and that the actual direction (T or NT) for a branch is resolved in the 10th stage. The processor is executing a program, which 10% of executed instructions are conditional branches, and the only stalls occur when the direction of a conditional branch is mis-predicted. The accuracies of the different a predictors for this program are as follows: Always-Taken 45% Always-Not-Taken 55% 2-bit 90% Global 95% Tournament 98%
7. Some branch instructions are more predictable than others. If we know that 80% of all executed conditional branch instructions, are easy to predict loop-back branches that are always predicted correctly by a dynamic predictor, what is the accuracy of the dynamic predictor on the remaining 20% if a 2-bit predictor is used?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply