Trucks arrive at the loading dock of a wholesale grocer at the rate of 1.2 per hour. A single crew consisting of two wor

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Trucks arrive at the loading dock of a wholesale grocer at the rate of 1.2 per hour. A single crew consisting of two wor

Post by answerhappygod »

Trucks Arrive At The Loading Dock Of A Wholesale Grocer At The Rate Of 1 2 Per Hour A Single Crew Consisting Of Two Wor 1
Trucks Arrive At The Loading Dock Of A Wholesale Grocer At The Rate Of 1 2 Per Hour A Single Crew Consisting Of Two Wor 1 (31.46 KiB) Viewed 35 times
Trucks arrive at the loading dock of a wholesale grocer at the rate of 1.2 per hour. A single crew consisting of two workers can load a truck in about 30 minutes. Crew members receive $10 per hour in wages and fringe benefits, and trucks and drivers reflect an hourly cost of $63. The manager is thinking of adding another member to the crew. The service rate would then be 2.4 trucks per hour. Assume rates are Poisson. Use Table 1 and Table 2. 10 a. Would the third crew member be economical? (Round your intermediate and final answer to 2 decimal places.) Yes > Answer is complete but not entirely correct. because, the total cost is $ 96.00 X b. Would a fourth member be justifiable if the resulting service capacity were 3 trucks per hour? (Round your intermediate and final answer to 2 decimal places.) Yes Answer is complete but not entirely correct. because, the total cost is $ 99.43 X

b. An employee has proposed adding new equipment that would speed up the loading rate to 5.71 trucks per day. The equipment would cost an additional $100 per day for each dock. What is the lowest daily total cost that can be achieved with the new equipment? (Round your cost amount to 2 decimal places and all other calculations to 3 decimal places.) Answer is complete but not entirely correct. 1,550.00 The daily total cost with the new equipment is $

Trucks are required to pass through a weighing station so they can be checked for weight violations. Trucks arrive at the station at the rate of 21 an hour between 7:00 p.m. and 9:00 p.m Currently two inspectors are on duty during those hours, each of whom can inspect 14 trucks a hour. Use Table 18.4. a. How many trucks would you expect to see at the weighing station, including those being inspected? (Round your answer to 3 decimal places.) Ls b.lf a truck was just arriving at the station, about how many minutes could the driver expect to at the station? (Round your answer to 2 decimal places.) Ws 4.284 trucks Pw 0.20 min. c. What is the probability that both inspectors would be busy at the same time?(Round your answer to 4 decimal places.)

d. How many minutes, on average, would a truck that is not immediately inspected have to wait? (Round your answer to the nearest whole number.) W₂ min. f. What is the maximum line length for a probability of .92? (Round up your answer to the next whole number.) L max
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!