16 An all-equity company is considering investing in the following projects: Project Asset beta Expected return [96] A 0
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
16 An all-equity company is considering investing in the following projects: Project Asset beta Expected return [96] A 0
16 An all-equity company is considering investing in the following projects: Project Asset beta Expected return [96] A 0.75 6.38 B 0.92 7.22 с 1.22 7.93 The expected return on the market portfolio is 7.2%, whereas the risk-free rate is 2.596. Assume the CAPM holds. 1.0p Where do these three projects lie relative to the SML? Below the SML At the SML Above tha SML Project A 12000 Ooo 2000 Project B Project