Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

SOLVE AND GRAPH THE PROBLEM The Philippine Institute of Industrial Engineers (PIIE) is planning to put up its own buildi

Post by answerhappygod »

SOLVE AND GRAPH THE PROBLEM
The Philippine Institute of Industrial Engineers (PIIE) is
planning to put up its own building. Two proposals being considered
are: A. The construction of the building now to cost P400,000 B.
The construction of a smaller building now to cost P300,000 and at
the end of 5 years, an extension to be added to cost P200,000 By
how much is proposal B more economical than proposal A if interest
rate is 20% and depreciation to be neglected?