4. Estimate the erosion volume from a 3-acre secondary roadway construction during August-November in Fayetteville with
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
4. Estimate the erosion volume from a 3-acre secondary roadway construction during August-November in Fayetteville with
4. Estimate the erosion volume from a 3-acre secondary roadway construction during August-November in Fayetteville with Hiwassee soil. The road ditch has a slope of 0.08 ft/ft and 3:1 side slopes.