PROBLEM 10-An excavation 5m depth is supported by a sheet pile. The sheet pile is extended 3.2m below the ground and the

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

PROBLEM 10-An excavation 5m depth is supported by a sheet pile. The sheet pile is extended 3.2m below the ground and the

Post by answerhappygod »

Problem 10 An Excavation 5m Depth Is Supported By A Sheet Pile The Sheet Pile Is Extended 3 2m Below The Ground And The 1
Problem 10 An Excavation 5m Depth Is Supported By A Sheet Pile The Sheet Pile Is Extended 3 2m Below The Ground And The 1 (90.75 KiB) Viewed 58 times
PROBLEM 10-An excavation 5m depth is supported by a sheet pile. The sheet pile is extended 3.2m below the ground and the water table is at the bottom of the pile. Unit weight of soil is 1.91g/cc. Angle of internal friction is 34°. Which of the following most nearly gives the active force? * O . 178. 3 kN. 168. 3 kN. 158. 3 kN. 148. 3 kN. O NONE OF THE ABOVE