- As A New Hire At Bernhard Ulysses Indigo Lauper And Drane Infrastructure Technologies Llc Build It You Have Been 1 (272 KiB) Viewed 45 times
As a new hire at Bernhard, Ulysses, Indigo, Lauper, and Drane Infrastructure Technologies, LLC (BUILD-IT), you have been
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
As a new hire at Bernhard, Ulysses, Indigo, Lauper, and Drane Infrastructure Technologies, LLC (BUILD-IT), you have been
As a new hire at Bernhard, Ulysses, Indigo, Lauper, and Drane Infrastructure Technologies, LLC (BUILD-IT), you have been placed in charge of the newest project taken on by the firm to resurface the exterior of the building shown below. The resurfacing process requires that a new coating of finishing material be applied to all surfaces (excluding the roof and windows) at a minimum thickness of 0.125 inches. Additionally, the owners of the building would like to apply a window tinting to all windows, which consists of a thin film that is applied directly to the window's exterior. Based on the blueprints, the building has the following dimensions: 50 ft wide, 150 ft long, and 300 ft high. Estimate the volume of finishing material (in gallons) and the amount of window tinting material (in yd?) needed for the project. NOTE: there are 12 inches in 1ft, 3 ft in 1 yd, and 7.48 gallons in 1 ft? Your solution to this problem should utilize only the Diagram, Assumptions, Solution, and Conclusion sections of the problem presentation method.