6. A shared three-way pedestrian-bicycle facility has a width of 10 ft and carries a peak pedestrian flow of 500 p/15 mi
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
6. A shared three-way pedestrian-bicycle facility has a width of 10 ft and carries a peak pedestrian flow of 500 p/15 mi
6. A shared three-way pedestrian-bicycle facility has a width of 10 ft and carries a peak pedestrian flow of 500 p/15 min. The bicycle flow rate is 150 bicycles/h in the same direction as the pedestrians, and 160 bicycles/h in the opposite direction. The average pedestrians' speed is 4 ft/sec, and that for bicycles is 8 ft/sec. a) Determine the pedestrians' LOS (5 pts). b) Determine the LOS for the shared bicycle paths (5 pts).
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!